Short answer. When a client asks for something different in the middle of the work, changing the plan is not the mistake. Changing it without writing it down is. Before I say yes, I note what changes, how much time and resources it takes, what moves, and who approves. The change goes into the plan only when those answers exist.

A project starts with a plan everyone approves. In the third week a message arrives: "While you're at it, could you also include…?" It is a small request, almost polite. Nobody feels it as a big change. But the following week another one arrives, and then another.

The problem is not that the client asks. It is that the team answers without knowing what it just accepted. A yes said in the hallway, in a message, or on a short call is often where delays start, and then they get explained as surprises.

A change is not a favor

I learned this by going through the opposite. When someone asks for something different, the request has a cost, even a small one. Somebody has to do it, another task slips, and some deliverable changes its date. If those consequences are invisible, the plan has not really changed. It has only become harder to keep.

A change without a written cost is not a favor. It is a debt someone will pay later.

That is why my first reaction is never a yes. My first question is what moves if I say yes.

First, write down what changes

The first step is putting the request into a sentence both sides understand. "Add a second review round to the proposal" is concrete. "Make the proposal better" is not. Once the request is written, I can see whether it changes the result, the scope, or only the way we reach it.

That difference matters. Some requests change only the form. Others change what gets delivered. The second kind needs a formal conversation, even when the person asking has the best intentions.

Why changes arrive late

They rarely come from bad faith. They come because the person asking sees today's need, not the whole plan. From where they stand, one more small thing sounds reasonable. From where the team stands, that one more thing can move three deliverables.

So I do not judge the request. I make the plan visible. Showing on one page what gets delivered, when, and with which dependencies usually clears things up more than any debate about whether the change is big or small.

A team reviewing work at a whiteboard
Photography: Austin Distel / Unsplash
A mid-project change needs a cost, a date, and an approver before work starts.

Context photograph; does not depict NUUMA’s team or clients.

Measure the cost before you answer

Before replying, I ask the team three things: how long it takes, which other task moves, and what risk appears if we do not do it this week. With those answers, the decision stops being a courtesy yes or no and becomes a choice made with data.

You do not need a complicated sheet. A four-line note is enough: what changes, what it costs, what moves, and who approves. That note can go to the client as it is, and it usually brings the conversation into order in ten minutes.

Who approves the change

A decision without an owner returns to the pending list unresolved. Each change needs someone on the client side who approves it, and someone on the team side who accepts it. If the client cannot approve, I say so plainly: the change waits until someone with that authority confirms it.

It also helps to separate who asks from who decides. The person asking may not have authority to move the budget or the date. Asking who approves is not distrust. It is knowing who to talk to.

What you can accept without moving the plan

Not every change requires reopening the project. Some adjustments fit inside the current plan, as long as they cost little and do not move important deliverables. A format change, a small copy revision, or an extra meeting a week can go in without much process, as long as they are written down.

The rule I follow is simple: if the adjustment can be absorbed without moving the date or the scope, I accept it and note it. If not, we negotiate. What I never do is absorb it in silence to look good in the moment and then charge for it late.

When the change does move the plan

When a change affects scope, date, or budget, I present three options: do it now and move the date, do it in a second phase, or leave it out of this project. Each option has its cost written down. That way the client chooses with the same information I have.

Presenting options changes the conversation. It is no longer about saying no, but about showing what each path implies. Often the best option is one the client did not expect: splitting the work into two phases with two clear dates.

Planning sheet on a wooden table
Photography: Kelly Sikkema / Unsplash

Context photograph; does not depict NUUMA’s team or clients.

An illustrative example

Imagine a process diagnosis project with a four-week timeline. In the third week, the client asks to include a second area that was not in scope. The team responds with a note: what gets added, how much time it needs, what slips, and who approves. The client decides to split the work into two phases. The first ends on the original date; the second is planned later, with its own date.

This example is illustrative. It does not describe a real client or promise a result. It shows how a change can become a clear decision instead of a mess.

What gets lost when nobody writes it down

When changes are not written, the project becomes hard to explain. Nobody remembers what was accepted, what was promised, or who said yes. At the end, a discussion starts about what "had been left out." That discussion costs more than the change itself.

A simple list of changes, with date, description, cost, and approver, prevents almost all of those debates. It is not bureaucracy. It is shared memory, and it protects both sides when the plan is reviewed at the end.

When the change comes from the team

Sometimes the change is not requested by the client, but by someone on the team who found something new. That is a good sign, but it is still a change. I treat it the same way: I write it down, measure the cost, and present it before acting. If we do it on our own initiative, the client should not pay for it without knowing.

This also protects the team. If every finding becomes extra work without a conversation, people learn to keep quiet about what they discover. That costs more than any adjustment.

When the team knows it can raise its hand, the project speaks more clearly. Questions arrive on time, decisions are made with information, and the client learns what changed before the delivery or the invoice arrives. That does not prevent every change, but it prevents the most expensive surprises, which are usually the ones nobody wanted to mention early.

If the same kind of change shows up three times, I treat it as a different signal. The original scope was probably not written clearly enough. At that point it is better to return to the plan, correct it with the client, and confirm the new version than to keep absorbing adjustments.

Common mistakes

The first mistake is accepting out loud. The second is absorbing the change without telling anyone, to look good in the moment and pay for it later. The third is changing the work without updating the delivery date. A fourth, less visible one, is not reviewing the accumulated changes: ten small adjustments can move more than one large one.

If you want to keep those changes under control without slowing the team down, delegation with follow-up helps a lot. I explained it in how to delegate with ownership and follow-up.

What to do this week

  1. Gather the changes you accepted in the last month, even the ones agreed by message.
  2. For each one, write what changes, what moves, and who approved it.
  3. For any new request, reply with a four-line note before you confirm.
  4. Separate the adjustments that fit in the plan from those that move the date or scope.
  5. Review the change list every Friday, along with its accumulated impact.

If you want to review your project with me

Write to me and tell me what has changed in your project since the original plan. I will tell you whether what is missing is writing the change down, naming who approves it, or looking at the scope again. If you want to see how we support planning and follow-up, review our work on structure and operations.

For the step before that, when you are still deciding what to quote, I explain it in before quoting, understand the project. And if the change arrives with a lot of urgency around it, the way to order that is in when everything is urgent.

Sources and context

What I describe here comes from my October 7, 2026 interview and from my work at NUUMA. The exercises and illustrative examples are suggestions for applying this way of thinking; they are not client results. For further reading: Atlassian on project management, the Deming Institute's PDSA cycle, and Atlassian on roles and responsibilities.

For your project

What you know about the project

Try the article’s approach with your own context.

Your next step

A self-check that opens questions without rating your business.

Editorial exercise. Your answers are used only on this page; they are not sent or saved.